We have collaborated with Ingevin on our strategic bottling center project. They worked on the process articulation and optimization with space constraints because of architectural dimension of the project (Building in h form ). They knew how to find the best solution to succeed this challenge and set an industrial tool in a building that was not designed with this purpose. Their availability with our teams allowed us to realize this project in 13 months. For me the the different profile and competences among their team is major asset that made the difference on this project.